Sunday, August 25, 2019

Delay at road crossings to Johore

After monitoring the delay at the SG and JB end of the two road crossings, I conclude that about 75% of the time, it takes longer to clear the SG end. However, the difference is usually quite small. So, the longer time is acceptable.

See the detailed results here:
https://www.facebook.com/kinlian/posts/2954787847927181?

No comments:

Post a Comment