I suggest that the ministry of national development consider this approach to provide drainage and laying of cables and water pipes.
1) Design a drain that can carry away drain water and have three compartments for running electricity cables, telecom cables and water pipes. The cables and pipes are located above the normal flow of water. The cover for the drains will be solar panels.
2) Use prefab technology to build these drain sections.
3) Replace the side walks of the roads with these covered drains and include the cables and pipes.
4) New buildings and additional supplies will tap into the new cables. No more digging up of roads.
Does this sound like a good idea?
1) Design a drain that can carry away drain water and have three compartments for running electricity cables, telecom cables and water pipes. The cables and pipes are located above the normal flow of water. The cover for the drains will be solar panels.
2) Use prefab technology to build these drain sections.
3) Replace the side walks of the roads with these covered drains and include the cables and pipes.
4) New buildings and additional supplies will tap into the new cables. No more digging up of roads.
Does this sound like a good idea?
No comments:
Post a Comment