There is something seriously wrong with the new signal system installed by SMRT. We did not have this kind of problem in the past.
I do not believe that a new signal system should cause this kind of frequent breakdowns and delays.
The SMRT trains run on two separate lines. They do not mix with other lines. The trains do not change from one line to another.
There is no need to introduce a complicated signal system for a simple operation and end up with endless troubles.
I suggest that SMRT should consider reverting to the old system. They can cancel the contract for $195 million to install the new system. They can look for a better alternative.
I read from Wikipedia that the old system can be reinstalled. See here.
https://en.wikipedia.org/wiki/North_South_MRT_Line
I do not believe that a new signal system should cause this kind of frequent breakdowns and delays.
The SMRT trains run on two separate lines. They do not mix with other lines. The trains do not change from one line to another.
There is no need to introduce a complicated signal system for a simple operation and end up with endless troubles.
I suggest that SMRT should consider reverting to the old system. They can cancel the contract for $195 million to install the new system. They can look for a better alternative.
I read from Wikipedia that the old system can be reinstalled. See here.
https://en.wikipedia.org/wiki/North_South_MRT_Line